| Taping cathedral ceiling in new foyer |
| Taping the peak |
| Taping is almost done and ready for paint |
| Old furnace room Stairs at back to basement and heating and cooling units for the nurseries |
| Taping the cathedral ceiling in the foyer |
| Taping the bulkhead in nursery room 3 |
| Moving plumbing to the basement |
| Electrician busy wiring up the heating units |
| A tight spot to work in |
| Working on the heating ducts |
| Busy in the basement |
| Lots of help to get the heating unit up and running |
| Taking off brickwork for another window in the meeting room |
| Left side - opening to the new hallway Right side - another window has been added |
| Red barrels and jerry cans containing ethanol to be put into lines for geothermal |
| Installing Geothermal unit in the basement |
| Drywall on cathedral ceiling in foyer nears completion |
| Strapping the underside of the canopy |
| Inside new back entrance looking toward consistory room entrance (doorway in center) |
| Inside back entrance looking towards new meeting room entrance (behind wheelbarrow). Doorway in center is for new library, doorway on right is for new washrooms. |
| Spray painting the cold air return pipes that will be hung in the back of the sanctuary |
| The painted pipes standing in the foyer, ready to be installed |
| The back benches are removed to make way for the scaffolding |
| Looking down into the sanctuary from the top of the scaffolding |
| Looking down from atop the scaffolding |
| Measuring out where the pipes will hang |
| Right about there should be good |
| The first pipe is lifted into place |
| Almost done |
| A couple of short pieces remain |
| Putting insulation in the cathedral ceiling of the foyer |
| Another job done |