Friday, 28 June 2013

Mon - Fri, June 24 - 28

Taping cathedral ceiling in new foyer

Taping the peak

Taping is almost done and ready for paint

Old furnace room
Stairs at back to basement and
 heating and cooling units for the nurseries

Wednesday, 19 June 2013

Mon - Wed, June 17 - 19

Taping the cathedral ceiling in the foyer

Taping the bulkhead in nursery room 3
Moving plumbing to the basement

Electrician busy wiring up the heating units

A tight spot to work in




Working on the heating ducts
Busy in the basement
Lots of help to get the heating unit up and running

Taking off brickwork for another window in the meeting room





Left side - opening to  the new hallway
Right side - another window has been added



Saturday, 15 June 2013

Wed - Fri, June 12 - 14

Red barrels and jerry cans containing ethanol to be put into lines for geothermal


Installing Geothermal unit in the basement

Drywall on cathedral ceiling in foyer nears completion

Strapping the underside of the canopy

Inside new back entrance looking toward consistory room entrance (doorway in center)

Inside back entrance looking towards new meeting room entrance (behind wheelbarrow).  Doorway in center is for new library, doorway on right is for new washrooms.

Tuesday, 11 June 2013

Mon - Tues, June 10 - 11

Putting on drywall in foyer against the back sanctuary wall

Looking down the hallway towards the consistory room

Looking down the hallway towards the meeting room

More drywall being delivered

Geothermal (heating) units arrive

Thursday, 6 June 2013

Thurs - Fri, June 6 & 7

A load of drywall arrives

Unloading the drywall

Insulation and plastic are around the windows,
and now ready for drywall
Finishing the flat roof on the canopy


Wednesday, 5 June 2013

Mon - Wed, June 3 - 5

Spray painting the cold air return pipes that will be hung in the back of the sanctuary
The painted pipes standing in the foyer,
ready to be installed
The back benches are removed to make way for the scaffolding

Looking down into the sanctuary from the top of the scaffolding

Looking down from atop the scaffolding

Measuring out where the pipes will hang

Right about there should be good



The first pipe is lifted into place



Almost done




A couple of short pieces remain 

Putting insulation in the cathedral ceiling of the foyer

Another job done

Fri, May 31

Heating pipes in the basement

A clearer picture