Taping cathedral ceiling in new foyer |
Taping the peak |
Taping is almost done and ready for paint |
Old furnace room Stairs at back to basement and heating and cooling units for the nurseries |
Taping the cathedral ceiling in the foyer |
Taping the bulkhead in nursery room 3 |
Moving plumbing to the basement |
Electrician busy wiring up the heating units |
A tight spot to work in |
Working on the heating ducts |
Busy in the basement |
Lots of help to get the heating unit up and running |
Taking off brickwork for another window in the meeting room |
Left side - opening to the new hallway Right side - another window has been added |
Red barrels and jerry cans containing ethanol to be put into lines for geothermal |
Installing Geothermal unit in the basement |
Drywall on cathedral ceiling in foyer nears completion |
Strapping the underside of the canopy |
Inside new back entrance looking toward consistory room entrance (doorway in center) |
Inside back entrance looking towards new meeting room entrance (behind wheelbarrow). Doorway in center is for new library, doorway on right is for new washrooms. |
Spray painting the cold air return pipes that will be hung in the back of the sanctuary |
The painted pipes standing in the foyer, ready to be installed |
The back benches are removed to make way for the scaffolding |
Looking down into the sanctuary from the top of the scaffolding |
Looking down from atop the scaffolding |
Measuring out where the pipes will hang |
Right about there should be good |
The first pipe is lifted into place |
Almost done |
A couple of short pieces remain |
Putting insulation in the cathedral ceiling of the foyer |
Another job done |