Friday, 3 May 2013

Friday, May 3

The parsonage next door

Framing the walls inside - at the front is the new library
(Back left is the old outside door to the meeting room)

Aerial view
Bringing in a steel beam for the portico (covered porch)
The second beam is lowered into place
Guiding the beam onto the steel post
I-SPAN joists are added
Many hands make light work

The joists are almost all up
Another aerial view with the portico
A closer look
Looking up
Another week of work is done!




 














Wed & Thurs, May 1 & 2

Putting on the overhang, and plywood on the roof

Putting the overhang on
:)
Where the new roof joins up with the consistory room roof
Most of the plywood is on the roof
Sitting on the job :)
Where the roof joins at the back right corner of the santuary

Laying on the job :)

Did he fall asleep :)
The hard hat had to come off to get at this hard-to-get-at job
The flat section of the roof

The flat section is hidden from view


Starting to look impressive