The windows have arrived and installation begins |
From the inside |
Above the portico |
Working on the portico |
Sealing the flat section of the roof with tar |
Blocks of tar that are heated and pumped up onto the roof |
Flat section is done. Air conditioning units are put up |
Working on the inside of back entrance |
Framing walls for storage room, washroom, and stairway |
Insulation panels for under the concrete basement floor |
Panels being laid in |
The "decorating committee" deciding on stone and shingles |