Spray painting the cold air return pipes that will be hung in the back of the sanctuary |
The painted pipes standing in the foyer, ready to be installed |
The back benches are removed to make way for the scaffolding |
Looking down into the sanctuary from the top of the scaffolding |
Looking down from atop the scaffolding |
Measuring out where the pipes will hang |
Right about there should be good |
The first pipe is lifted into place |
Almost done |
A couple of short pieces remain |
Putting insulation in the cathedral ceiling of the foyer |
Another job done |