The gable end is framed in |
Working on the flat roof |
Checking out the progress from the top of the ladder |
View from the top |
Taking shape |
Framing in a window |
Starting to plywood the roof |
The walls are being sheeted |
Part of the old roof is being removed |
The section to be removed is almost off |
Installing a temporary wall to support the front roof |
The front wall of the old library is removed |
The boom truck arrives to lift off the old trusses and put up the new |
These trusses are all being removed |
Patiently waiting at the controls of the boom truck |
The first old truss comes off |
Putting a new truss in its place |
Cathedral trusses over the new foyer |
Over half the trusses are up |
Booming another truss into place |
Hooking up the next truss |
Guiding the truss into place as it is being boomed up |
The pastor and his children come to inspect the work |
All the trusses are up over the new foyer and rear entrance |
Things are really taking shape |
Putting new heating ducts in nursery 3 |
New heating ducts in the nurseries are done |
Redi-wall came to boom up the roof trusses |
The trusses are ready to go up |
The first truss is in place |
Watching the trusses go up |
Booming up more trusses |
The first section is almost done |
Looking from a distance |
Looking from the back entrance towards the meeting room |
Looking from the back entrance towards the consistory room |
Finishing off the geothermal in the field |
Steel post for beam in corner by consistory room |
Steel beam outside new washrooms |
Booming in steel beams for roof trusses |
The first beams are in place |
Removing the beam clamp |
The beam is secure |
Bringing steel beam into existing foyer |
Putting the beam in place using a genie lift |
Piping in place for new washrooms |
Opening in nurseries for new heating ducts |
Carefully making another hole in the wall for new heating ducts without making too much mess |