| The gable end is framed in |
| Working on the flat roof |
| Checking out the progress from the top of the ladder |
| View from the top |
| Taking shape |
| Framing in a window |
| Starting to plywood the roof |
| The walls are being sheeted |
| Part of the old roof is being removed |
| The section to be removed is almost off |
| Installing a temporary wall to support the front roof |
| The front wall of the old library is removed |
| The boom truck arrives to lift off the old trusses and put up the new |
| These trusses are all being removed |
| Patiently waiting at the controls of the boom truck |
| The first old truss comes off |
| Putting a new truss in its place |
| Cathedral trusses over the new foyer |
| Over half the trusses are up |
| Booming another truss into place |
| Hooking up the next truss |
| Guiding the truss into place as it is being boomed up |
| The pastor and his children come to inspect the work |
| All the trusses are up over the new foyer and rear entrance |
| Things are really taking shape |
| Putting new heating ducts in nursery 3 |
| New heating ducts in the nurseries are done |
| Redi-wall came to boom up the roof trusses |
| The trusses are ready to go up |
| The first truss is in place |
| Watching the trusses go up |
| Booming up more trusses |
| The first section is almost done |
| Looking from a distance |
| Looking from the back entrance towards the meeting room |
| Looking from the back entrance towards the consistory room |
| Finishing off the geothermal in the field |
| Steel post for beam in corner by consistory room |
| Steel beam outside new washrooms |
| Booming in steel beams for roof trusses |
| The first beams are in place |
| Removing the beam clamp |
| The beam is secure |
| Bringing steel beam into existing foyer |
| Putting the beam in place using a genie lift |
| Piping in place for new washrooms |
| Opening in nurseries for new heating ducts |
| Carefully making another hole in the wall for new heating ducts without making too much mess |