Sunday School room taken out to make room for new washrooms |
Removing concrete floor in former SS room |
SS room wall is moved 1 foot into hallway |
An ambitious young volunteer! |
Looking down the hallway towards the sanctuary |
Framing in the new wall |
What's left of the library (left) and the newly framed walls (right) for the new washrooms |
New wall is drywalled |
Cutting the floor in the foyer outside the sanctuary |
Digging out to prepare for poured concrete pier |
Measuring to calculate concrete needed for pier |
Concrete pier is poured and ready for steel post |
Front entrance |
Removing brick beside existing rear entrance |
Removing floor inside existing rear entrance |