Monday, 22 April 2013

Inside Work Begins



Sunday School room taken out to make room for new washrooms


Removing concrete floor in former SS room
SS room wall is moved 1 foot into hallway



An ambitious young volunteer!


Looking down the hallway towards the sanctuary


Framing in the new wall
What's left of the library (left) and the newly framed walls (right) for the new washrooms




New wall is drywalled


Cutting the floor in the foyer outside the sanctuary




Digging out to prepare for poured concrete pier



Measuring to calculate concrete needed for pier


Concrete pier is poured and ready for steel post




Front entrance
Removing brick beside existing rear entrance


Removing floor inside existing rear entrance