| Sunday School room taken out to make room for new washrooms |
| Removing concrete floor in former SS room |
| SS room wall is moved 1 foot into hallway |
| An ambitious young volunteer! |
| Looking down the hallway towards the sanctuary |
| Framing in the new wall |
| What's left of the library (left) and the newly framed walls (right) for the new washrooms |
| New wall is drywalled |
| Cutting the floor in the foyer outside the sanctuary |
| Digging out to prepare for poured concrete pier |
| Measuring to calculate concrete needed for pier |
| Concrete pier is poured and ready for steel post |
| Front entrance |
| Removing brick beside existing rear entrance |
| Removing floor inside existing rear entrance |