| Laying paving stone outside back entrance |
| Room behind library for ???? |
| Wall lights in foyer |
| Handicap washroom in hall by consistory room |
| Trying to figure out the location of the pews, distance apart and angle |
| Pews need straightening out |
| String lines and tape measures are a big help |
| Positioning the sound system booth, now at the back right of the sanctuary |
| A cleaning crew came in Saturday morning to wipe everything down |
| Ladies hard at work |
| Making sure the sound system is working for Sunday |
| Screwing down the pews - laying on the job! |
| All back in place |
| Ready on time for Sunday's services |
| Meeting room ready for use too |
| In need of name labels so they can be used |
| The new sinks in the washrooms |
| Men's washroom |
| Ladies washroom |
| Friday -- back foyer needs cleaning |
| Saturday -- back entrance also cleaned and ready to be used |
| Front entrance with tiling inside the door |
| The new large foyer |
| Consistory room door at the end of the hallway |
| The new and enlarged consistory room |
| The new library |
| Tiles being laid inside the front entrance |
| Carpet goes down in the foyer |
| Vacuuming the new carpet in the sanctuary |
| The benches still need to be secured |
| Cabinetry in the consistory room |
| Putting plumbing fixtures in the men's washroom |
| The men's washroom |
| Hooking up the sinks in the washroom |
| First roll of carpet goes down in the sanctuary |
| No, they're not really working in the dark! |
| Fixing a floor seam under the carpet |
| Carpet in the meeting room has a plum coloured strip along the outside |
| New lights in the foyer |
| Measuring out the height for mailboxes |
| First set of mailboxes gets hung |
| Making it secure |
| There they are - members mailboxes, with storage cabinets underneath |
| The toilets are in, but not very private yet!! |
| Men's washroom awaiting plumbing fixtures |