Interior doors waiting to be stained |
Staining the interior doors |
Painting the meeting room walls |
Repainting the existing door trim |
Old carpet is removed in the foyer |
Adding more lights in the parking lot |
High on the zoom boom |
Operating the zoom boom |
Preparing concrete |
Filling in the low areas in the old hallway |
Floors are somewhat levelled out Lights above bulkheads are in |
Hallway floor from meeting room to foyer is prepared for levelling out |
All level and smooth |
Rough floor in old hallway |
Foyer flooring also gets levelled out |
Looking from consistory room door to meeting room |
Top of the basement stairs |
No comments:
Post a Comment