Friday, 12 July 2013

Fri, July 12


Lumber arrives for improvement of sanctuary roof
Removing overhangs


Adding garbage to the bin

Working on the sanctuary peaks

Booming up lumber with the zoom boom
Changing the peaks angle
Levelling out the peak ridges
Back view of the church


Putting in the foyer lights



Speakers in the foyer ceiling

Putting new lights in the suspended ceiling
in the old part of the foyer






Mon - Thurs, July 8 - 11

Interior doors waiting to be stained
Staining the interior doors
Painting the meeting room walls

Repainting the existing door trim

Old carpet is removed in the foyer



Adding more lights in the parking lot


High on the zoom boom

Operating the zoom boom


Preparing concrete



Filling in the low areas in the old hallway


Floors are somewhat levelled out
Lights above bulkheads are in

Hallway floor from meeting room to foyer
is prepared for levelling out


All level and smooth

Rough floor in old hallway



Foyer flooring also gets levelled out

Looking from consistory room door to meeting room



Top of the basement stairs